MSD Project Clear News

  • Type:

MSD Grand Glaize Wastewater Treatment Plant in Valley Park Operational

January 4, 2016 | Alerts

The Metropolitan St. Louis Sewer District’s (MSD) Grand Glaize Wastewater Treatment Plant servicing Valley Park and areas in western St. Louis County is now functioning, pumping water through the plant.…

Read More

MSD Grand Glaize Wastewater Treatment Plant in Valley Park Has Shutdown Due to Flood Waters

December 31, 2015 | Alerts

Early Thursday morning the Metropolitan St. Louis Sewer District’s (MSD) Grand Glaize wastewater treatment plant in Valley Park was shutdown as flood waters breached a sandbag levee built to protect…

Read More

Fenton Wastewater Treatment Plant Shutdown

December 29, 2015 | Alerts

Late Monday evening crews with the Metropolitan St. Louis Sewer District (MSD) detected and discovered the Fenton Wastewater Treatment Plant was not operating. The plant is located near the intersection…

Read More

Board Stakeholder Committee Meeting, December 14, 2015, 3:00 PM

December 14, 2015 | Blog

The documents posted here were the materials used by MSD staff at the Board Stakeholder Committee meeting, held on Monday, December 14, 2015, at 3:00 PM.  Included is the presentation…

Read More

Final Test Results From the Bridgeton Landfill Pump Station

December 4, 2015 | Press Releases

The Metropolitan St. Louis Sewer District (MSD) has received and reviewed the results of all water quality samples collected from the sewage overflow that occurred at the Bridgeton Landfill on…

Read More

The Metropolitan St. Louis Sewer District Receives High Credit Ratings from Standard & Poor’s, Fitch, and Moody’s

November 25, 2015 | Blog

The Metropolitan St. Louis Sewer District (MSD) was assigned a AAA rating from Standard & Poor’s, an AA+ from Fitch, and an Aa1 from Moody's for an upcoming revenue bond…

Read More

Caused Determined in Bridgeton Landfill Pump Station Failure

November 10, 2015 | Press Releases

The Metropolitan St. Louis Sewer District (MSD) has identified the cause of the sewage overflow that occurred at the Bridgeton Landfill Tuesday afternoon, October 27, 2015.A technician from MSD discovered…

Read More

Cleanup Complete on Sewage Manhole Overflow at the Bridgeton Landfill

October 30, 2015 | Press Releases

Crews with the Metropolitan St. Louis Sewer District (MSD) and Hunt Vac Services, a private contractor, have completed the cleanup of the sewage overflow that occurred at the Bridgeton Landfill…

Read More

Update on Sewage Manhole Overflow at the Bridgeton Landfill

October 28, 2015 | Alerts

Crews with the Metropolitan St. Louis Sewer District (MSD) and Hunt Vac Services, a private contractor, completed the primary cleanup phase, which consists of “vacuuming” up the sewage and draining…

Read More

MSD Responds to Sewage Manhole Overflow at the Bridgeton Landfill

October 28, 2015 | Alerts

Crews with the Metropolitan St. Louis Sewer District (MSD) and Hunt Vac Services, a private contracted crew hired by MSD, are at the site of a sewage overflow that occurred…

Read More