Deer Creek Tunnel Pump Station
The Deer Creek Tunnel Pump Station operates the Deer Creek Tunnel, which stores and transports wastewater for treatment. The Deer Creek Tunnel is a 19-foot diameter tunnel, 200 feet underground, that runs 4.3 miles from Clayton to Shrewsbury. It can hold approximately 40 million gallons of wastewater.
This virtual tour is compatible with almost any connected device, including PCs, Macs, tablets, phones and VR goggles. Just click or tap to move forward, or click and drag with your mouse or swipe with your finger to enjoy a 360-degree view. Tap on the orange dots for information and videos about how the tunnel was built and how it works, or tap on the green dots to enter the next section of the tunnel. The interactive icons in the lower left-hand corner can be used to change your view or jump to another part of the pump station.
Click here to launch your virtual tour of the Deer Creek Tunnel Pump Station.